| name/production | system | description | stages |
Subway / Utility enterprise «Kiev subway» / Syretsko-Pecherskaya line |
Station «Syrets» (from the station «Dragozhitchi» to the station «Sirets» with reverse dead-end sidings)
|
Microprocessor interlocking system of switches and signals |
Total number of switches is 2,
Section length is 1,55 km |
1) working project;
2) software;
3) equipment supply;
4) assembling,putting into operation;
5) permanent maintenancedetails >>
|
Station «Borispolskaya» (from the station «Kharkovskaya» to the station "Borispolskaya")
|
Microprocessor interlocking system of switches and signals |
Total number of switches is 6,
Section length is 2,36 km |
1) working project;
2) software;
3) equipment supply;
4) assembling,putting into operation;
5) permanent maintenancedetails >>
|
Technical station electrodepot «Kharkovskoye» (from the station «Kharkovskaya» to the Kharkov’s square with electrodepot "Kharkovskoye")
|
Microprocessor interlocking system of switches and signals |
Total number of switches is 38 |
1) working project;
2) software;
3) equipment supply;
4) assembling,putting into operation;
5) permanent maintenancedetails >>
|
Station “Kharkovskaya” (from the station “Kharkovskaya” to the Kharkov’s square with electrodepot “Kharkovskoye”)
|
Replacement of SKC-67 to SKC+ |
|
Working project details >>
|
| Station “Chervoniy Khutor” (from the station “Kharkovskaya” to the Kharkov’s square with electrodepot “Kharkovskoye”. II launching complex, station “Chervoniy Khutor” with reverse dead-end sidings and the II launching complex of electrodepot “Kharkovskoye”)
|
Microprocessor interlocking system of switches and signals |
Total number of switches is 2,
Section length is 1,85 km |
details >>
|
Subway / Utility enterprise «Kiev subway» / Kurinevsko-Krasnoarmeyskaya line |
| Station «Goloseyevskaya» (first queue of construction from the station «Lybidskaya» to the station "Vasilkovskaya")
|
Microprocessor interlocking system of switches and signals |
Total number of switches is 3 |
1) working project;
2) software;
3) equipment supply;
4) assembling, putting into operationdetails >>
|
| Station «Vasilkovskaya» (first queue of construction from the station «Lybidskaya» to the station "Vasilkovskaya")
|
Microprocessor interlocking system of switches and signals |
|
1) working project;
2) software;
3) equipment supply;
4) assembling,putting into operationdetails >>
|
Subway / Utility enterprise «Kiev subway» / Future outlooks |
| Levoberezhnaya line
|
Microprocessor interlocking system of switches and signals |
5 stations with electrodepot, total length is 11,89 km |
details >>
|
| Podolsko-Voskresenskaya line
|
Microprocessor interlocking system of switches and signals |
6 stations with electrodepot, total length is 12,47 km |
details >>
|
| Kurinevsko-Krasnoarmeyskaya line
|
Microprocessor interlocking system of switches and signals |
6 stations, total length is 5,72 km |
details >>
|
Subway / Utility enterprise «Kharkov subway» |
| Kharkov subway
|
Microprocessor scheme of acceleration and breaking control system at electric drives |
|
1) working project;
2) software;
3) equipment supply;
4) assembling, putting into operation;
5) trial maintenancedetails >>
|
Subway / Utility enterprise «Kharkov subway» / |
|
|
|
|
details >>
|
|
|
|
|
details >>
|
Subway / Utility enterprise «Kharkov subway» / |
|
|
|
|
details >>
|