Projects

name/productionsystemdescriptionstages

Subway / Utility enterprise «Kiev subway» / Syretsko-Pecherskaya line

Station «Syrets» (from the station «Dragozhitchi» to the station «Sirets» with reverse dead-end sidings)
Microprocessor interlocking system of switches and signals Total number of switches is 2,
Section length is 1,55 km
1) working project;
2) software;
3) equipment supply;
4) assembling,putting into operation;
5) permanent maintenance

details >>

Station «Borispolskaya» (from the station «Kharkovskaya» to the station "Borispolskaya")
Microprocessor interlocking system of switches and signals Total number of switches is 6,
Section length is 2,36 km
1) working project;
2) software;
3) equipment supply;
4) assembling,putting into operation;
5) permanent maintenance

details >>

Technical station electrodepot «Kharkovskoye» (from the station «Kharkovskaya» to the Kharkov’s square with electrodepot "Kharkovskoye")
Microprocessor interlocking system of switches and signals Total number of switches is 38 1) working project;
2) software;
3) equipment supply;
4) assembling,putting into operation;
5) permanent maintenance

details >>

Station “Kharkovskaya” (from the station “Kharkovskaya” to the Kharkov’s square with electrodepot “Kharkovskoye”)
Replacement of SKC-67 to SKC+   Working project

details >>

Station “Chervoniy Khutor” (from the station “Kharkovskaya” to the Kharkov’s square with electrodepot “Kharkovskoye”. II launching complex, station “Chervoniy Khutor” with reverse dead-end sidings and the II launching complex of electrodepot “Kharkovskoye”) Microprocessor interlocking system of switches and signals Total number of switches is 2,
Section length is 1,85 km
 

details >>

Subway / Utility enterprise «Kiev subway» / Kurinevsko-Krasnoarmeyskaya line

Station «Goloseyevskaya» (first queue of construction from the station «Lybidskaya» to the station "Vasilkovskaya") Microprocessor interlocking system of switches and signals Total number of switches is 3 1) working project;
2) software;
3) equipment supply;
4) assembling, putting into operation

details >>

Station «Vasilkovskaya» (first queue of construction from the station «Lybidskaya» to the station "Vasilkovskaya") Microprocessor interlocking system of switches and signals   1) working project;
2) software;
3) equipment supply;
4) assembling,putting into operation

details >>

Subway / Utility enterprise «Kiev subway» / Future outlooks

Levoberezhnaya line Microprocessor interlocking system of switches and signals 5 stations with electrodepot, total length is 11,89 km  

details >>

Podolsko-Voskresenskaya line Microprocessor interlocking system of switches and signals 6 stations with electrodepot, total length is 12,47 km  

details >>

Kurinevsko-Krasnoarmeyskaya line Microprocessor interlocking system of switches and signals 6 stations, total length is 5,72 km  

details >>

Subway / Utility enterprise «Kharkov subway»

Kharkov subway Microprocessor scheme of acceleration and breaking control system at electric drives   1) working project;
2) software;
3) equipment supply;
4) assembling, putting into operation;
5) trial maintenance

details >>

Subway / Utility enterprise «Kharkov subway» /

       

details >>

       

details >>

Subway / Utility enterprise «Kharkov subway» /

       

details >>


SPE «Railwayautomatic» Ltd

61034, Kharkov, Poltavskiy Schlyach Street, 190
tel./fax: +38 (057) 719-62-45, 724-10-27;
tel.(railroad): 4-10-27
E-mail: rwa@rwa.com.ua
-------------------------------------------
309516, Russia, Stariy Oskol
mailbox: 934
E-mail: rwa@pochta.ru